§ 250.110. Requirement To Prevent, Control and Reduce Stormwater Pollutants By The Use of Best Management Practices.  


Latest version.
  • The City will adopt requirements identifying Best Management Practices for any activity, operation or facility which may cause or contribute to pollution or contamination of stormwater, the storm drain system or waters of the U.S. The owner or operator of a commercial or industrial establishment shall provide, at their own expense, reasonable protection from accidental discharge of prohibited materials or other wastes into the municipal storm drain system or watercourses through the use of these structural and non-structural BMP. Further, any person responsible for a property or premises which is or may be the source of an illicit discharge may be required to implement, at said person's expense, additional structural and non-structural BMP to prevent the further discharge of pollutants to the municipal separate storm sewer system. Compliance with all terms and conditions of a valid NPDES permit authorizing the discharge of stormwater associated with industrial activity, to the extent practicable, shall be deemed compliant with the provisions of this Section. These BMP shall be part of a Storm Water Pollution Prevention Plan (SWPP) necessary for compliance with requirements of the NPDES permit and a copy shall be maintained in the stormwater manager's office at the Public Works Department.
Ord. No. 09-7363 §1, 11-24-2009